The Cabin

The Cabin

Saturday, July 19, 2014

A New House – Episode 9 – I Second That! (Storey that is)

We are quickly approaching THE BIG DAY, THE BIG KAHUNA, That life episode of episodes (i.e., son Ben getting married this week!), so the house project is winding down temporarily.

But in the last two weeks we have layed down the 2nd floor joists and subfloor, started building 2nd floor walls and family room gable ends and chimney chase, and finished fine grading around the house.

P1010410

The floor joists supporting the 2nd floor span a full 25’ across the house, so they were a little beefier and wider (14” vs 12”) than the 1st floor that had a bearing wall to help with support. While heavyish, we managed a way to get them up there and trimmed in place – learning trick from the first floor.

 P1010411

I really like these i-joists – light and straight. But don’t assume the factory ends are square (lesson learned)

 P1010412

This an “LVL” beam (laminated veneer lumber) that is needed to create the stairwell opening.

 P1010413

Me. In the house. 

P1010416

 P1010417

i built a makeshift “boom” for the tractor to help tilt up the 18’ chimney chase. Worked great!  It would helped with those gable ends for the family room.

 P1010420

Deb has become a master with the sheathing nailer. And (unlike me) doesn’t mind the high ladder work.

 P1010421

Deb work for days finishing the grading around the house. She did a superb job.

 P1010423

The outside part of the chase is done, but we still have inside work to do.

 P1010424

We’ve started walls on the 2nd floor. Those taller walls are the shed dormers. The other side will look the same.

Sunday, July 6, 2014

A New House – Episode 8 – More Walls

 

It has been a while since i last posted our progress. Been rather busy framing walls, grading, and constructing a mini foundation….

P1010371

Walls continue to go up.  We’re doing 9’ walls in the main floor.

P1010373

got to have lots of bracing to hold things up!

 P1010375

Deb has been the tractor queen this week, doing a great job backfilling and grading around the house P1010377  .. and nailing

P1010379

 P1010378

P1010380

 P1010382  P1010386

Exterior walls are framed except the right end which we’ll leave open for now so we can bring lumber and plywood for the second floor.

 P1010384

Since the “wall incident” now all walls are framed in smaller sections

P1010388

We have our excavation guy back to remove “mount Reed”  - a big pile of high clay dirt. He moved it to the hill and dumped it over the side.
P1010390

 P1010392

Plywood covering the window openings are cut out afterwards

  P1010399

The french drain taking water from around the house .

 P1010400

 P1010401

We’ll have a fireplace in the family room, so we had to build a short wall to support the chimney chase.

 P1010404

P1010406

Nice lake view from the family room. We’ll have a french door here with windows on each side.

 P1010409

All exterior walls are framed and sheathed (except end wall)

P1010407

now doing interior walls before starting the second floor joists.

  P1010403