Tuesday, July 28, 2015

A Day for the History Books

Dateline 1955: Walt Disney opens the most famous theme park in the world …. some say to celebrate the birth of baby Dana. Walt was heard to say “I only hope that we don't lose sight of one thing - that it was all started by a little boy*”… People came from far and wide in hopes of catching a glimpse of baby Dana, born a few miles away in Pomona, CA on July 23.

footnote: * the PR people didn’t like the way that sounded, so they changed it to “it was all started by a mouse”.

dlanddana2

60 years later, people flock to Anaheim, California and Valley, Washington to celebrate the 60th birthday of Dana…. and to a lesser extent, Disneyland. Gee… why didn’t we all just go to Disneyland instead?

sixsix7638111

P1020161

left to right; Sheila, pat, Frank, Reggie, Mack, Gary, Carolyn and Eric

P1020162

L to R: Dave, Teresa, Janette, Kyle, Xin Xin and Jason

P1020185

L to R: Frank, Katherine, Eric and Kyle

P1020177

L to R: Sue, Reggie, Sheila, Maria, Victor, Mack, Frank

IMG_20150725_131725

About 1:30, the sky let loose with a downpour

IMG_20150725_131731

   IMG_20150725_131818

So people grabbed chairs and ran for the safety of the new house

 IMG_20150725_133856  IMG_20150725_133905-2

Frank didn’t want to play reindeer games

  IMG_20150725_180025

Then Dana led a couple rousing chorus of happy birthday

IMG_20150725_180030 IMG_20150725_180037

 IMG_20150725_180055

Then blew out the candles

  P1020153

Folks enjoyed hanging out in the gazebo

 P1020154

and playing games…watch that slice, Carolyn!

    P1020158

Who’s teaching who here? Carolyn and Maria

  P1020160

Isn’t that a ball still on the ground Victor?

P1020157

Maria chipping into the net

    P1020163

Victor, Katherine, Maria and Sue at horseshoes

  P1020165

L to R: Xin Xin, Jason, Sheila, Pat, Frank, Kyle, Reggie, Mack and Gary

P1020168

then around 4pm, the power goes out for a couple of hours. Good thing for backup generatorsP1020167

Dana and Victor setting up the generator (after killing the wasp nest at the outside plug)

     P1020170

Katherine cooking beans by candlelight.

 P1020171

Then the power came back and the grub was on. Jason digging in on Salads, brisket, pulled pork, rolls, beans, pies and carrot cake

 P1020172

 P1020173

Dave, Maria and Jason

 P1020174

Sue, Dave, Gary and Carolyn

 P1020175

Kyle all by himself

 P1020176

Teresa, Janette, and Maria, with Dana, Victor and Sheila in background

   P1020179

Debbie, Dana, Jason, Xin Xin, Dave, Reggie, Sue, Sheila, Maria and Victor

  P1020181

Victor, Mack, Frank and Katherine

 P1020182

Carolyn, Gary, Dana, Jason, Reggie

 P1020183

Jason, Xin Xin, Reggie, Sheila, Dave, Sue and Maria

 P1020184

Reggie’s legs, Sheila, sue, Maria, Victor, Mack

  P1020186

Katherine, Eric and Kyle

P1020178

It was a great weekend. Thanks to everyone who came to celebrate with us.

Monday, July 20, 2015

A New House – Episode 22 – Stained Glass Window, Soffits, HVAC and Insulation

 

The past couple of weeks has been mostly a jumble of “ miscellaneous stuff on our list” that we’ve been trying to finish up. Most of it fun, rewarding work, some not so much fun …

 P1020130

The “not so fun” part is putting up soffit boards on the underside of the left gable end. Easy to put up, except for fighting wasps at the top of a 100’ ladder (or at least if felt like 100’).

 P1020131

P1020142

We also finished the underside of the porch. Fitting along the logs was tricky. On my next house:), I’ll put the rafters on a 1x4 on top of the logs to make room for the soffit boards.

   P1020134

We also built the frame for the stained glass window Deb made many moons ago.

 P1020135  P1020137

P1020146

Inside view from the foyer. Pretty cool, eh?

   P1020140

    P1020144

I also finished the installation and setup for the mini split heat pump systems. We have two – a 12,000 BTU system for the upstairs, and an 18,000 BTU for the main floor.  The Fujitsu units will both heat and cool and are efficient from –13 to 115 degrees. I installed these systems without professional help, but had to buy a vacuum pump and gauge to purge the copper lines before the refrigerant was released into the system.

   P1020147

Our mini splits are “ducted” so that the indoor components are hidden. Most mini split system use wall mounted indoor units. This unit for the main floor is located in the ceiling of the basement freezer room, and is ducted up to the dining/kitchen area.

P1020151

The upstairs unit is located in the bedroom closet above the ceiling. ducted to the bedroom and the loft areas.

 P1020148

Deb took the opportunity to install insulation on the basement walls, where we knew we would not have any plumbing.

P1020150

Wednesday, July 1, 2015

A New House – Episode 21 – The Porch

 

The past three weeks we have been on a mission to complete the front porch roof and deck. Unfortunately this is during a really unusually hot streak from 90+ to 107 degrees every day. 

The sonotube concrete footings were already in place, and we prepared to start the porch roof by pre-installing a nailer board for the rafters and completing the soffit boards on the under side of the main roof.

nailer

The porch roof support posts and beam are all log – which Debbie had spend weeks meticulously peeling and sanding.

 notch

Then I had to notch the top of the posts with a radius matching the beam diameter – more or less. So before we put up the posts, everything was notched and fitted on the ground. 

P1020103

Once again, I cobbled together an extension on the tractor to be able to lift the posts and beams to the height we needed. Once a post was set on the footing, we braced it into place nice and “level’.

 P1020104

 P1020105

Well, as you know, trees aren’t perfect. The important thing is that the notches are all in alignment so the beam sits into the saddles nicely – more or less.

 P1020106

the posts are all in place ready for the beams. The porch roof is 32’ long. We used two 16’ log beams that were 9-11” in diameter.

 P1020107

Up we go!  But don’t stand under it – just in case!

 P1020108

Lifting the log beams went pretty smoothly. Everything is tied together with log screws.

 P1020109

Then up go the 2x6 rafters. Since the log is not flat, level, and perfect, each rafter had to be fitted so that the roof was level end to end. This meant lots to notching on the top of the beams. I screwed the rafters down into the log beam using 8” log screws.

 P1020110

  P1020112

Then up goes the plywood. Once again Debbie is doing the roof work :)

 

  P1020115

The plywood is all up.

 P1020116

Now after the posts are stained, we install the corner braces. Deb spend a couple of days peeling and sanding these puppies.

 P1020117

Each brace had to be fitted to the contour of their associated logs

plane

I used my new ‘Turboplane’ to cut the notches on the top of the posts and for the log braces. It was a real time saver.

 P1020118

P1020127

After the roof was up, I built the deck. Apparently over night since I took no pictures of the process. Deb was out of town for e few days and I plumb fergot. Anyway – 2x6 joists sitting between hangers along the wall and a 4x10 beam running down the back side of the posts – bolted. The deck surface is called “Elite Deck” which is pressure treated/pre-stained douglas fir. All screwed down with coated deck screws. The hard part was cutting the decking around the log posts.

 P1020121

Before we could put the metal on the porch roof, we had to complete some siding work that we needed the porch roof to access. Soffits under the front of the dormers, siding on each dormer, and fascia boards on the porch roof. Hey who is that up on the roof again?

 P1020122

Siding the sides of the dormers was a bit tricky. We had to sit a ladder onto blocking in the porch roof. It looks precarious but it really wasn’t too bad. The worst part was dealing with wasps. We also installed that short section of siding above the porch roof below the main roof.

 P1020123

The siding for this part of the house is 1x8 cedar board on board. All the cedar had to be pre-stained before we put it up. 

 P1020124

I’m beginning to think she really likes this roof work!  But hey – somebody has to be on the ground cutting the boards – climbing up and down the ladder all day. These sides were a bit tricky because the top is 5/12 pitch and the bottom 10/12 – all sloping at an angle.

I am pretty sure this day got to 107 degrees.

  P1020126

Today we installed the metal on the porch roof. 95 degrees today. Hot metal.

  P1020128

Yay  -all done!  Those short posts on the left will be part of a narrow deck that will run down the left side of the house and wrap around in front of Kyle’s bedroom.