A New House – Episode 8 – More Walls

 

It has been a while since i last posted our progress. Been rather busy framing walls, grading, and constructing a mini foundation….

P1010371

Walls continue to go up.  We’re doing 9’ walls in the main floor.

P1010373

got to have lots of bracing to hold things up!

 P1010375

Deb has been the tractor queen this week, doing a great job backfilling and grading around the house P1010377  .. and nailing

P1010379

 P1010378

P1010380

 P1010382  P1010386

Exterior walls are framed except the right end which we’ll leave open for now so we can bring lumber and plywood for the second floor.

 P1010384

Since the “wall incident” now all walls are framed in smaller sections

P1010388

We have our excavation guy back to remove “mount Reed”  - a big pile of high clay dirt. He moved it to the hill and dumped it over the side.
P1010390

 P1010392

Plywood covering the window openings are cut out afterwards

  P1010399

The french drain taking water from around the house .

 P1010400

 P1010401

We’ll have a fireplace in the family room, so we had to build a short wall to support the chimney chase.

 P1010404

P1010406

Nice lake view from the family room. We’ll have a french door here with windows on each side.

 P1010409

All exterior walls are framed and sheathed (except end wall)

P1010407

now doing interior walls before starting the second floor joists.

  P1010403